Recently, the City of Quality and Technical Supervision of Special amusement park equipment Safety Supervision Department on city playgrounds, the major existing 237 large-scale amusement park facilities safety investigation. All devices tested meet the eligibility criteria and found no security risk. In the inspection process focused on the device, but also on the job training for management staff and operating instructions.
City of Quality and Technical Supervision Staff recommends that parents lead the children to the park to ride rides, be sure to see the warning signs or Passengers of the project. Above will be written very clearly, what kind of people can not ride; much kids bumper cars need adult supervision and other considerations. In particular there is a tumbling action rides, should easily drop things, such as keys, cell phone, glasses, camera safekeeping. Ride rides, obey the command staff of the operation, in sequence from top to bottom, can not hold more luck when riding.
Zhengzhou is a professional amusement equipment manufacturers. There are National Quality Supervision, Inspection and Quarantine issued a "large-scale recreational facilities manufacturing license" and "large-scale recreational facilities installation permit" and has a high-quality, skilled professional technical team.
2013年12月30日星期一
Trends indoor play equipment
With the development of today's society, children's outdoor play equipment operators shifted from indoor business model. Wait before the era of open-air run, you are also willing to let the children undergo the torture of exposure to wind and hot sun it? Now kids can be described as Inflatable Bouncer heartstrings, if the indoor environment cool and superior health conditions, you still want to let the kids play outside right. So if you want to operate children's amusement industry, please carefully choose their operating position.
2013年12月18日星期三
Amusement equipment safety management regulations governing the use of units
"Amusement equipment safety technology supervision regulation article 42, made clear that amusement equipment safety management regulations governing the use of units. Warm prompt: are friends or preparing amusement equipment management can look a lot.
Using unit must establish a safety management system, define safety responsibility of the relevant personnel; Improving the safety management system, and shall be implemented strictly. The safety management system attraction ride include at least:
(a) assignment services personnel policy.
(2) safety operation procedures.
(3) the equipment management system.
(4) the daily safety inspection system.
(5) regular inspection system.
(6) the safety of the operation and related service personnel training appraisal system.
(7) system of emergency drill.
(eight) maintenance system.
(9) accidents and accident treatment system.
File management system (10) technology.
Using unit must establish a safety management system, define safety responsibility of the relevant personnel; Improving the safety management system, and shall be implemented strictly. The safety management system attraction ride include at least:
(a) assignment services personnel policy.
(2) safety operation procedures.
(3) the equipment management system.
(4) the daily safety inspection system.
(5) regular inspection system.
(6) the safety of the operation and related service personnel training appraisal system.
(7) system of emergency drill.
(eight) maintenance system.
(9) accidents and accident treatment system.
File management system (10) technology.
2013年12月17日星期二
Amusement equipment related facilities what are the requirements?
Near New Year's day, hope in the New Year the indoor amusements equipment can safely and healthy development of our country, before talking about amusement equipment safety, today with everyone talking about amusement equipment related facilities what are the requirements, let us focus on amusement equipment industry.
(a) amusement equipment basic requirements are as follows:
1. The basis of amusement equipment shall not appear uneven settlement, cracking and loose phenomenon;
(2) connected with the base bolt locking measures must be adopted;
3. The amusement equipment foundation should be considered in the design load of the following: earthquake, wind load and wind load caused by display CARDS and decorations and its weight, for large amusement facilities, operating units must provide local weather, power supply, seismic and geological data, to check for the design and manufacture of units;
4. Civil engineering foundation or building large theme park ride facilities must be in accordance with the design drawings and technical documents by the corresponding qualification unit construction, after the acceptance of by the relevant department, in order to install.
(2) set up the amusement equipment in and out of the secure channel, requirements are as follows:
1. The tourists should avoid danger and the measures to prevent high drop;
2. The stair surface, the adhesion surface should not have sharp corners, obstacles, should fortify jitter, anti slide, prevent fall stumble and other security measures;
3. The width of the stairs and ramps should not less than 500 mm, stair tread width is not less than 250 mm, bench height is not more than 200 mm, slope is not greater than 1:4 ramps, stairs, ramps, platform shall have security protection measures, to prevent falling from height.
(3) the amusement equipment platform railings and requirements:
1. Amusement equipment around and platform, all should set up security fence or isolation measures, security fences should comply with the GB8408, indoor children's entertainment project Settings security fence height not less than 0.65 m;
2. In the inlet should guide the fence, the platform should be slippery measure;
3. The gate open direction should travel with passengers in the same direction;
4. The inner side of the gate shall establish thrust block, in case of a closed after excessive squeeze the tourists.
(a) amusement equipment basic requirements are as follows:
1. The basis of amusement equipment shall not appear uneven settlement, cracking and loose phenomenon;
(2) connected with the base bolt locking measures must be adopted;
3. The amusement equipment foundation should be considered in the design load of the following: earthquake, wind load and wind load caused by display CARDS and decorations and its weight, for large amusement facilities, operating units must provide local weather, power supply, seismic and geological data, to check for the design and manufacture of units;
4. Civil engineering foundation or building large theme park ride facilities must be in accordance with the design drawings and technical documents by the corresponding qualification unit construction, after the acceptance of by the relevant department, in order to install.
(2) set up the amusement equipment in and out of the secure channel, requirements are as follows:
1. The tourists should avoid danger and the measures to prevent high drop;
2. The stair surface, the adhesion surface should not have sharp corners, obstacles, should fortify jitter, anti slide, prevent fall stumble and other security measures;
3. The width of the stairs and ramps should not less than 500 mm, stair tread width is not less than 250 mm, bench height is not more than 200 mm, slope is not greater than 1:4 ramps, stairs, ramps, platform shall have security protection measures, to prevent falling from height.
(3) the amusement equipment platform railings and requirements:
1. Amusement equipment around and platform, all should set up security fence or isolation measures, security fences should comply with the GB8408, indoor children's entertainment project Settings security fence height not less than 0.65 m;
2. In the inlet should guide the fence, the platform should be slippery measure;
3. The gate open direction should travel with passengers in the same direction;
4. The inner side of the gate shall establish thrust block, in case of a closed after excessive squeeze the tourists.
Exchange links need to adhere to the principle of amusement equipment website
Link in our amusement equipments site play a very important role. Can exchange links is the means of improving site keywords ranking, can get more attention, but also the most quickly can let the weight of your site down. Sums up to at the time of exchanging links need to adhere to the principles of:
Must first to locate their own websites, he decided the website construction and development direction, after the improper positioning of the site, when exchanging links to need to exchange has correlation with content link. It is better to promote your web site, after and related website links, the user can focus on other web sites at the same time, see their own websites, traffic for your website and profile, spiders can more easily to their own websites, such as fairground rides like amusement equipment investment promotion network with related investment can change network toys, amusement equipment, network, network, association network, such as when exchanging links need to control the quantity and quality.
After exchanging links to check
Frequently, some strange, because the site is down right, server problems such as instability causing the site to open it, check, can timely find and inform each other, let the other side even solve, so as not to affect your web site. Have to admit that some people after exchanging links when weight on your own website or other reasons, will unilaterally remove the links for each other, also do not notify the other party. This will affect our own website. Also fill out of course because of other reasons lead to the other party does not have its own website links, polite to contact each other, if it really is the other active, removed after such a webmaster exchanges, less personal character has a problem.
To the good faith in link
Exchange links, like life, hard work, must be honest, don't say link in a few days off, or back out in a period of time, see each other's ranking is not stable, or see each other a snapshot of the slow, then withdraw links, such practices are very immoral way. , if links to web sites have what problem, to give priority to with links of friendship, the friendship remind, friendship is help the better development of our website. Is only good faith exchange, can you get more friends and more friends will work with you to share resources and experience, such ability can contributes to the development of the site.
Must first to locate their own websites, he decided the website construction and development direction, after the improper positioning of the site, when exchanging links to need to exchange has correlation with content link. It is better to promote your web site, after and related website links, the user can focus on other web sites at the same time, see their own websites, traffic for your website and profile, spiders can more easily to their own websites, such as fairground rides like amusement equipment investment promotion network with related investment can change network toys, amusement equipment, network, network, association network, such as when exchanging links need to control the quantity and quality.
After exchanging links to check
Frequently, some strange, because the site is down right, server problems such as instability causing the site to open it, check, can timely find and inform each other, let the other side even solve, so as not to affect your web site. Have to admit that some people after exchanging links when weight on your own website or other reasons, will unilaterally remove the links for each other, also do not notify the other party. This will affect our own website. Also fill out of course because of other reasons lead to the other party does not have its own website links, polite to contact each other, if it really is the other active, removed after such a webmaster exchanges, less personal character has a problem.
To the good faith in link
Exchange links, like life, hard work, must be honest, don't say link in a few days off, or back out in a period of time, see each other's ranking is not stable, or see each other a snapshot of the slow, then withdraw links, such practices are very immoral way. , if links to web sites have what problem, to give priority to with links of friendship, the friendship remind, friendship is help the better development of our website. Is only good faith exchange, can you get more friends and more friends will work with you to share resources and experience, such ability can contributes to the development of the site.
订阅:
博文 (Atom)