"Amusement equipment safety technology supervision regulation article 42, made clear that amusement equipment safety management regulations governing the use of units. Warm prompt: are friends or preparing amusement equipment management can look a lot.
Using unit must establish a safety management system, define safety responsibility of the relevant personnel; Improving the safety management system, and shall be implemented strictly. The safety management system attraction ride include at least:
(a) assignment services personnel policy.
(2) safety operation procedures.
(3) the equipment management system.
(4) the daily safety inspection system.
(5) regular inspection system.
(6) the safety of the operation and related service personnel training appraisal system.
(7) system of emergency drill.
(eight) maintenance system.
(9) accidents and accident treatment system.
File management system (10) technology.
Zhengzhou is a professional amusement equipment manufacturers. There are National Quality Supervision, Inspection and Quarantine issued a "large-scale recreational facilities manufacturing license" and "large-scale recreational facilities installation permit" and has a high-quality, skilled professional technical team.
2013年12月18日星期三
2013年12月17日星期二
Amusement equipment related facilities what are the requirements?
Near New Year's day, hope in the New Year the indoor amusements equipment can safely and healthy development of our country, before talking about amusement equipment safety, today with everyone talking about amusement equipment related facilities what are the requirements, let us focus on amusement equipment industry.
(a) amusement equipment basic requirements are as follows:
1. The basis of amusement equipment shall not appear uneven settlement, cracking and loose phenomenon;
(2) connected with the base bolt locking measures must be adopted;
3. The amusement equipment foundation should be considered in the design load of the following: earthquake, wind load and wind load caused by display CARDS and decorations and its weight, for large amusement facilities, operating units must provide local weather, power supply, seismic and geological data, to check for the design and manufacture of units;
4. Civil engineering foundation or building large theme park ride facilities must be in accordance with the design drawings and technical documents by the corresponding qualification unit construction, after the acceptance of by the relevant department, in order to install.
(2) set up the amusement equipment in and out of the secure channel, requirements are as follows:
1. The tourists should avoid danger and the measures to prevent high drop;
2. The stair surface, the adhesion surface should not have sharp corners, obstacles, should fortify jitter, anti slide, prevent fall stumble and other security measures;
3. The width of the stairs and ramps should not less than 500 mm, stair tread width is not less than 250 mm, bench height is not more than 200 mm, slope is not greater than 1:4 ramps, stairs, ramps, platform shall have security protection measures, to prevent falling from height.
(3) the amusement equipment platform railings and requirements:
1. Amusement equipment around and platform, all should set up security fence or isolation measures, security fences should comply with the GB8408, indoor children's entertainment project Settings security fence height not less than 0.65 m;
2. In the inlet should guide the fence, the platform should be slippery measure;
3. The gate open direction should travel with passengers in the same direction;
4. The inner side of the gate shall establish thrust block, in case of a closed after excessive squeeze the tourists.
(a) amusement equipment basic requirements are as follows:
1. The basis of amusement equipment shall not appear uneven settlement, cracking and loose phenomenon;
(2) connected with the base bolt locking measures must be adopted;
3. The amusement equipment foundation should be considered in the design load of the following: earthquake, wind load and wind load caused by display CARDS and decorations and its weight, for large amusement facilities, operating units must provide local weather, power supply, seismic and geological data, to check for the design and manufacture of units;
4. Civil engineering foundation or building large theme park ride facilities must be in accordance with the design drawings and technical documents by the corresponding qualification unit construction, after the acceptance of by the relevant department, in order to install.
(2) set up the amusement equipment in and out of the secure channel, requirements are as follows:
1. The tourists should avoid danger and the measures to prevent high drop;
2. The stair surface, the adhesion surface should not have sharp corners, obstacles, should fortify jitter, anti slide, prevent fall stumble and other security measures;
3. The width of the stairs and ramps should not less than 500 mm, stair tread width is not less than 250 mm, bench height is not more than 200 mm, slope is not greater than 1:4 ramps, stairs, ramps, platform shall have security protection measures, to prevent falling from height.
(3) the amusement equipment platform railings and requirements:
1. Amusement equipment around and platform, all should set up security fence or isolation measures, security fences should comply with the GB8408, indoor children's entertainment project Settings security fence height not less than 0.65 m;
2. In the inlet should guide the fence, the platform should be slippery measure;
3. The gate open direction should travel with passengers in the same direction;
4. The inner side of the gate shall establish thrust block, in case of a closed after excessive squeeze the tourists.
Exchange links need to adhere to the principle of amusement equipment website
Link in our amusement equipments site play a very important role. Can exchange links is the means of improving site keywords ranking, can get more attention, but also the most quickly can let the weight of your site down. Sums up to at the time of exchanging links need to adhere to the principles of:
Must first to locate their own websites, he decided the website construction and development direction, after the improper positioning of the site, when exchanging links to need to exchange has correlation with content link. It is better to promote your web site, after and related website links, the user can focus on other web sites at the same time, see their own websites, traffic for your website and profile, spiders can more easily to their own websites, such as fairground rides like amusement equipment investment promotion network with related investment can change network toys, amusement equipment, network, network, association network, such as when exchanging links need to control the quantity and quality.
After exchanging links to check
Frequently, some strange, because the site is down right, server problems such as instability causing the site to open it, check, can timely find and inform each other, let the other side even solve, so as not to affect your web site. Have to admit that some people after exchanging links when weight on your own website or other reasons, will unilaterally remove the links for each other, also do not notify the other party. This will affect our own website. Also fill out of course because of other reasons lead to the other party does not have its own website links, polite to contact each other, if it really is the other active, removed after such a webmaster exchanges, less personal character has a problem.
To the good faith in link
Exchange links, like life, hard work, must be honest, don't say link in a few days off, or back out in a period of time, see each other's ranking is not stable, or see each other a snapshot of the slow, then withdraw links, such practices are very immoral way. , if links to web sites have what problem, to give priority to with links of friendship, the friendship remind, friendship is help the better development of our website. Is only good faith exchange, can you get more friends and more friends will work with you to share resources and experience, such ability can contributes to the development of the site.
Must first to locate their own websites, he decided the website construction and development direction, after the improper positioning of the site, when exchanging links to need to exchange has correlation with content link. It is better to promote your web site, after and related website links, the user can focus on other web sites at the same time, see their own websites, traffic for your website and profile, spiders can more easily to their own websites, such as fairground rides like amusement equipment investment promotion network with related investment can change network toys, amusement equipment, network, network, association network, such as when exchanging links need to control the quantity and quality.
After exchanging links to check
Frequently, some strange, because the site is down right, server problems such as instability causing the site to open it, check, can timely find and inform each other, let the other side even solve, so as not to affect your web site. Have to admit that some people after exchanging links when weight on your own website or other reasons, will unilaterally remove the links for each other, also do not notify the other party. This will affect our own website. Also fill out of course because of other reasons lead to the other party does not have its own website links, polite to contact each other, if it really is the other active, removed after such a webmaster exchanges, less personal character has a problem.
To the good faith in link
Exchange links, like life, hard work, must be honest, don't say link in a few days off, or back out in a period of time, see each other's ranking is not stable, or see each other a snapshot of the slow, then withdraw links, such practices are very immoral way. , if links to web sites have what problem, to give priority to with links of friendship, the friendship remind, friendship is help the better development of our website. Is only good faith exchange, can you get more friends and more friends will work with you to share resources and experience, such ability can contributes to the development of the site.
2013年11月21日星期四
MODERN AMUSEMENT GROUP CO.,LIMITED (original name: Zhengzhou Modern Amusement factory, founded in 1999) is a professional amusement equipment manufacturers. it's in Zhengzhou Henan Province China ,After recent years of development, Now we have three subsidiaries. Modern design company, Modern Amusement service company, Modern trading Co., Ltd. Main products: Carousel, pirate ship, swing chair, tourist train, bumper cars and other thrill rides, family rides.
2013年11月15日星期五
Amusement equipment maintenance
Equipment maintenance steps
A: plastic parts and glass fiber, usable soap water, disinfection detergent, bleach dilution after soaking, brush with a soft cloth or soft scrub,
Reoccupy clear water is rinsed clean, dry or dry with a clean cloth.In the end, 84 disinfectant spray disinfection.
Part 2: software sponge can use soft cloth with soap water scrub, or placed in sunlight disinfection.
Three: wet resistance, good thermal endurance, colorfast wooden parts, usable soap bubble after washing to dry, reoccupy 84 disinfectant spray disinfection.
Four: metal parts if asked to rust, usable brush to floating rust, wipe with dry cloth;Colorless sanhe after exposure in the sun, can buy
Since the spray paint about 20 cm distance, sweep and spray again, after being dry spray again, protection.Paint all dry again after cleaning, drying and sterilization.
Part five: electrical circuit when cleaning, first make sure blackouts, water is forbidden, generally scrub with wet cloth, wait for dry after appearing to turn on the juice.
Six: all Amusement equipment, outdoor slide, drill tube parts should not be water after rain, if any, should be in the lowest place play a diameter of 4 mm hole drainage.
Seven: if it is indoor activity room, the floors, walls, etc., daily ultraviolet light disinfection, indoor ventilation to often.Spraying disinfection with hydrogen peroxide solution once a week.
8: of course, at the same time must also want to check the connection part of the disinfection is solid, the metal frequently active connection part of the gas, electrical circuit and has no common parts
All parts are damaged, can not leave spike safe hidden trouble, etc
2013年11月11日星期一
Amusement equipment
amusement equipments is operating machinery facilities for tourists.Amusement equipment, medium sized amusement equipment can be divided into large and small three kinds of amusement equipment, concrete is divided into ZhuanMa class amusement equipment, rotating the plane class amusement equipment, rail train class amusement equipment, aquatic amusement equipment, naughty fort class amusement equipment, trampoline swing class amusement equipment, storage battery class amusement equipment, bumper car class equipment, gyro flight tower class amusement equipment, aerial touring class amusement equipment, pirate ship class amusement equipment, inflatable castle unpowered amusement and equipment etc.
2013年11月8日星期五
How to do electric remote control boat to the props and steps
The Electric boatsship approach: 1. Looking for a photo do you like to ship
2. Use your space imagination ability to draw on the paper plane graph, the ship save details, only draw the main body.
3. According to the contour line, with scissors to split it again. See if like ships in the picture,
4. Try a few times more, find the most like ships in the picture plane graph.
5. Will this post at 0.3-0.5 mm thin sheet metal (aluminum skin can also, but bad welding), according to the contour line, with scissors to split, it will be the joint welded (paint again.
6. Cut into a small round iron fan 3 leaf shapes, each leaf in the same direction appropriate bending Angle, the middle hole, one root length right of bicycles in the vertical welding wire as a propeller and axis of rotation.
7. Looking for a piece of old rod antenna (also available nib ink), the interception of a (bicycle steel wire inserted in the free rotation) as a shaft sleeve.
8. Looking for a toy motor will be fixed in the cabin after welding on the stent position, and in accordance with the figure connect these parts assembled, after check the presence of water in the bathtub can formal trial.